You are currently viewing EMPANELMENT IN CENTRAL RAILWAY

EMPANELMENT IN CENTRAL RAILWAY

EMPANELMENT IN CENTRAL RAILWAY

CONDUCTING FINAL LOCATION SURVEY USING DIGITAL TERRAIN/ELEVATION MODEL (DTM/DEM/DSM) GENERATED FROM SATELITE OR LIDAR IMAGERIES, STACKING OF ALIGNMENT ON GROUND, GEOLOGICAL & GEOPHYSICAL MAPPING & GEO-TECHNICAL INVESTIGTIONS, PLANNING & DESIGN OF TUNNELS, PREPARATION OF GADS OF BRIDGES. ESPS, PROJECT SHEET, LOP, SIP, DETAILED ESTIMATE, DPR, EIRR ETC AS DETAILED IN THE SCHEDULE & TENDER DOCUMENT PERTAINING TO CIVIL ENGINEERING, ELECTRICAL AND S7T DEPT. IN CONNECTION WITH NEW 4TH & 5TH RAILWAY LINE BETWEEN KASARA – IGATPURI / ASAVALI (APPROX. LENGTH 35,80 KM) AND KARJAT -LONAWALA/TALEGAON APPROX. =53.3 KM).

 

CLICK BELOW TO GET COMPLETE DETAILS

 


 

FOR MANY MORE  UPDATES AVAILABLE CLICK BELOW 

CLICK THE BELOW LINK TO READ THE COMPLETE CONTENTS

SOME CONTENTS OF THIS WEBSITE ARE FOR GOLD SUBSCRIBERS ONLY.

Join us as a GOLD SUBSCRIBER and get access to read important books.

CEV LIBRARY GOLD SUBSCRIPTION

KIND ATTENTION
We are going to close all what’s groups of CEV soon due to difficulties in posting information or message in more than 5 groups of CEV at a time.

All future posts of empanelment notices & professional importance will be shared on
1.
https://t.me/+dbHNkNO22xsyYTY1
2.
www.valuerworld.com
3. The Twitter handle of CEV India
https://twitter.com/cevindia?t=XbqlvnwUVz1G3uPgs749ww&s=09
after closing the groups.
All members of these groups are requested to register themselves at the following link immediately for Getting all related timely updates.